The plant we build

Anything that has to do with getting cable into the building and landing it cleanly.

Scope

Copper, fiber, and the hardware it lands on

If it is a pull, a termination, a rack, or a pathway, it is in scope.

Copper cabling

Cat6, Cat6a, and Cat7 station runs, terminated and labeled.

Fiber optic

Multimode and single-mode fiber, spliced or connectorized and certified.

Racks and cabinets

Two-post, four-post, and enclosed cabinets, set and grounded.

Patch panels

Copper and fiber panels dressed so the front and the back both read.

Cable management

Ladder tray, basket, J-hooks, and bundles that stay that way.

Pathways

Conduit, sleeve, and ceiling path planned before the pull.

Wi-Fi and device drops

The cable and the pathway for access points, cameras, and phones.

Voice and low voltage

Station cable for phones and the other low-voltage devices in the room.

Data closets

IDF and MDF build-outs, from the ladder rack to the last patch cord path.

Moves, adds, changes

Adds and removals in occupied buildings, on the same labeling standard.

Testing

Certification for copper and fiber, with results you can keep.

New construction

Rough-in through trim-out for buildings that are still going up.